North Hancock Road Extension Phases IIIA & IIIB

Posted at 1:57 pm on 03/24/2016

Project Description: Construct & widen North Hancock Road to a four-lane urban design roadway with curb & gutter, bike lane, sidewalks, and multi-use trail. Associated work includes: storm pipe & structure installation, retention pond, excavation, swale & ditch construction, gravity wall installation, guardrail installation, traffic signal installation/relocation, thermoplastic striping, sodding and other misc. construction. 

Project Owner: Lake County 



















Total Views: 5568